Naylor Industries
Further to a previous desk based assessment and contamination ground investigation we were appointed to undertake an intrusive detailed Coal Mining Risk Assessment investigation. The Client had proposed construction of a new office building, on a pre-prepared design, consisting of shallow strip foundations. A preliminary desk based assessment identified a potential for both shallow mine workings, and a series of mine shafts close to the development, resulting in concerns raised by the Mining Remediation Authority.
We were appointed to undertake the detailed Mining Risk Assessment to determine actual risk and a way forward for the Client and their design. ESP worked on behalf of the client to implement an agreed scope of works, liaise with the Mining Remediation Authority and provide a comprehensive assessment of risks posed by the legacy of coal mining.
Introduction
A Phase 1 Desk Study, inclusive of a preliminary Coal Mining Risk Assessment, identified that the site was likely underlain by a cover of Made Ground underlain by the Pennine Lower Coal Measures. The Cumberworth Thin Coal seam was indicated to trend across the eastern portion the proposed building footprint. The Cumberworth seam was recorded in literature to generally be around 200–300 mm thick (locally up to 400 mm), with a probable fireclay band and underlying ironstone also indicated to be present.


Our Work
Historical abandonment plans obtained as part of our assessment showed extensive fireclay and coal workings to the south and east of the site but did not show workings beneath the proposed development footprint.
As part of the investigation scoped by us, we implemented a series of rotary drillholes and trial pits to assess the potential for shallow mine workings and a series of targeted investigation work in the area of the suspected mine shaft. Drillholes were generally taken to depths of between 20m and 30m, to investigate the potential shallow coal workings, whilst the investigation points targeting the mine shaft were undertaken to shallower depths.
During the investigation works, a coal seam (the Cumberworth seam) was identified at depths of between 1.2m and 3.2m and recorded at thicknesses between 100mm and 400mm. Fireclay and ironstone bands were identified below the Cumberworth Seam. No direct evidence of mine workings, such as voids, or indirect evidence such as unexplained loss of drilling flush, was identified within the coal, fireclay or ironstone horizons.
Two mine shafts were identified as posing a generally low risk to the development due to the their location and zone of influence. The position and elevation of the investigation shaft correlate well with the records of the shaft presented on abandonment plan and Mining Remediation Authority information, and the measured depth also correlated with the depth shown on the abandonment plan.
Investigation of this shaft, identified if to be around 3m diameter and 8.5m depth, with a 2.1m. This depth correlated with the depth of the base of the fireclay band in the adjacent investigation drillholes. Probable ironstone) was suspected at the base of the mine shaft drilling works.
Following detailed review of the findings and development proposals, we concluded on a low likelihood for direct or indirect evidence that coal, fireclay or ironstone beneath the site has been worked in the past. We concluded that the subsidence risks to the proposed development associated with such shallow workings was low, and further risk mitigation measures were not considered warranted. Infilling of the shaft with concrete was considered sufficient to mitigate any outstanding subsidence risks to the proposed office building associated with the mine shaft.
We provided the Client and design team with a comprehensive ground investigation and assessment to determine the risk posed by shallow coal/fireclay/ironstone workings and proximity of the development to historic mine shafts. Our findings and conclusions were communicated to and discussed with the Mining Remediation Authority, who agreed with our findings and allowed the proposed design to be competed with no further investigation or assessment recommended. The works were completed within budget and in an accelerated time frame to allow commencement of the scheme.
Speak to Us Today
Get in touch with our team via our email, enquiries@earthsciencepartnership.com or phone number, 02920 813385 and we’ll be very happy to help with and discuss any geotechnical engineering project requirements you may have.
For a full list of all ESP capabilities, please click here.