Flood Fact Sheet

  1. Flooding has recently caused misery to thousands and will affect human settlements for the foreseeable future. Flood risks present significant constraints on existing and new developments. In extreme cases, planning blight can prevent much needed improvements to facilities in existing settlements leading to urban decay.
  2. New developments on infill sites or contiguous to existing settlements may be aborted causing increased pressure on the green belt. Planning gain contributions from developers which could finance much needed improvements to existing infrastructure may be lost to that community.
  3. Increasing pressure for development means that all types of marginal land, including those subject to flooding are being brought forward as potential development sites. Flood risks are a material factor in planning decisions and government policy is addressed in a series of guidance documents published over the last few years. Details of practice and implementation have varied across the nation, but are usually based on regional maps indicating perceived levels of risk published by the Environment Agency based on existing conditions at the time of compiling the maps. These are accompanied by guidance tables listing types of development appropriate for each risk level.
  4. No policy document can foresee the complexities of every development problem and it has been recognised recently that policy and its implementation requires a degree of flexibility so that appropriate and informed development decisions can be taken to achieve policy targets. In 2006, the Welsh Environment Minister issued a clarification letter which indicated that objections from regulators should be based on future flood risks at the site under consideration rather than simplistic interpretations of policy.
  5. Such changes help open the way to securing permission to develop in higher risk zones by providing appropriate mitigation measures. In our experience there are several key factors to consider at an early stage. Some are listed below.
  6. Many flood prone areas are seen as helping to mitigate flood risks by providing temporary storage of flood waters. In fact they often only have sufficient capacity to store a few minutes of peak river flow from a design flood event which may last for hours or days. The contribution of these areas is in providing conveyance for the flood waters to pass downstream, not storage. Developing such areas can be feasible provided the conveyance is replaced by other means such as river works or relief channels / culverts.
  7. Land raising is the gold standard of flood protection because it takes the protected area out of the flood plain. It is expensive. However, land raising need not extend across the whole of the development area. The protected lower hinterland can be considered for development provided the raised land between it and the source of flooding is erosion resistant and has a large aspect ratio (width / height) such that a breach failure is inconceivable. It is important not to rely on traditional flood defences, rather the design should aim to ‘fine tune’ the geometry of the river channel and valley bottom so that flood flows can pass safely without affecting the residential areas or impacting on other reaches of the watercourse.
  8. flood risk table imageSimplistic interpretations of Flood Risk concentrate on depth and velocity of flood waters. For a realistic interpretation it is important to include quantitative assessments of post development betterment or detriment arising from changes in Rate of Rise, Speed of Inundation and Flood Escape Routes. The tables shows a simple scoring system.
ItemScoreContent
Rate of Rise & Speed of Inundation0.5Hydrographs show similar time/flood profile for pre & post with around thirty minutes delay until inundation.
Flood Hazard Rating-0.5Pre = (1.1+0.5)*1.4=2.24. Post = (1.1+0.5)*1.8=2.88.
Flood Escape Routes0.5Post development will provide a nearby (<10m) dry escape route where they are absent pre-development.
Total (Post Development)0.5Slight Betterment Indicated.

The Flood Hazard Rating is a standard DEFRA/EA derived ratio that combines flood depth with flood velocity to establish an indication of risk. Our assessments extended this concept to acknowledge benefits of other key factors during a time of flood, and also to demonstrate that slight changes in depth did not always change the real-world impact. This approach was very successful in communicating actual risks to stakeholders, which included non-professionals, and was acknowledged by the EA as a useful contribution to Flood Risk Assessment.

The design sheet below is an example of Flood Resistant Design for the proposed Merthyr Vale Renewal area.

If you require more information on our comprehensive flood risk assessment services then get in touch with us today and we’ll be happy to help.

Flood Fact Sheet Chart Graphic

Related Projects

Archives

Share this post

This entry was posted in Projects.

We operate within a framework of professional memberships and industry-recognised accreditations, including ISO9001 and ISO 14001, ensuring that our technical delivery is consistently aligned with the highest standards of quality and governance.

Our Accreditations

Client Testimonials

Posted on Google Google
Simon Lewis profile picture
Simon Lewis
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Earth Science Partnership recently completed an independent geo-environmental review for us and I have been extremely impressed with both the quality of their work and the professionalism of the team. The report was comprehensive, balanced and technically robust, helping us navigate a complex evidence base and identify the key issues requiring further consideration. Just as importantly, ESP were approachable and willing to engage constructively with questions arising from the draft report. Special thanks to Daniel Thomas for his time, patience and willingness to explain technical matters in a way that non-specialists could understand. It was clear throughout that the focus was on objective, evidence-led analysis rather than simply telling a client what they wanted to hear. A highly professional consultancy and one I would most happily recommend. Simon Lewis : Secretary : Nant-Y-Calch Conservation Group
Posted on Google Google
Barbara profile picture
Barbara
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Earth Science Partnership has helped us immensely through a , long, stressful and complex situation following a major leak under our property. We had the absolute pleasure of working with Giles Sommerwill, who was with us every step of the way. He helped us to understand the geological conditions and ramifications following such a major leak, and then informed and advised us during the process of agreeing a remedial solution with the water company, as well as helping us address other issues that arose over time. Giles is experienced, knowledgeable and highly qualified. We could not have hoped to work with anyone more professional, reliable or kind. We also felt that Giles was genuinely concerned, not just about our property, but about our well-being. Thanks to him, we highly recommend, and praise, Earth Science Partnership.
Posted on Google Google
Roberta Morgan profile picture
Roberta Morgan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Having used the services of Earth Science Partnership on two previous occasions, we had no reservations about employing them for a third time. They are very professional and produce excellent detailed reports on what they are able to do. They are prepared to listen to everything you require and would highly recommend them.
Posted on Google Google
Joshua Pike profile picture
Joshua Pike
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
ESP undertook some thorough CMRA (Coal Mining Risk Assessment) works for our site. They showed a surprising level of knowledge into the historical mining methods and establishment of mining sites. Prompt and in-depth reporting and great communication, would definitely recommend.
Posted on Google Google
Duncan Phillips profile picture
Duncan Phillips
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great client to deal with!
Posted on Google Google
Keri Beal profile picture
Keri Beal
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great communication, excellent prompt service.
Posted on Google Google
Oliver Stacey profile picture
Oliver Stacey
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
ESP have done some excellent GI works for me and produced some excellent in depth reports for our client (Network Rail)

Speak To Our Experts Today

Earth Science Partnership is a leading geoenvironmental and geotechnical expert, delivering a comprehensive range of specialist services across Wales, England, Scotland, Northern Ireland and Ireland. We have decades of combined experience in our team of industry-recognised experts.

Our work, for homeowners, land owners, developers, and investors is completed in compliance with the latest, relevant industry best practices and guidance. We understand that every project is unique, so we deliver our services tailored to your needs.

Whether you require initial site investigation, complex hazard engineering, or comprehensive environmental impact assessments, the ESP team can support you with a straightforward, cost-effective solution for any stage of your asset development.