This housing development site has been the subject of two previous investigations. The information from the previous phases of work were collated and assessed and a targeted site investigation followed. The investigation included trial pitting, however, the method of works were considerate to the environmental constraints.
Supplementary geo-environmental testing was carried out on Made Ground, Topsoil and Glacial Diamicton across the site such that they could all be suitably classified in accordance with WM3. In addition, Waste Acceptance Criteria testing was undertaken to help the classification of material leaving site.
Our analysis and assessment helped the client understand where waste generated on site would need to be taken during construction, so that programme delays in this regard were prevented.

In addition, topsoil testing in accordance with BS:3882 was implemented across the site such that its reuse could be done with certainty, or where the topsoil was not in accordance with the standard, could be removed and treated.
All of the above information was provided in a concise report simply outline the previous findings of the investigation, the new work done and the findings of the WM3, WAC and Topsoil testing.