To inform the design of a new footbridge across the Western Cleddau River in the town centre of Haverfordwest, ESP were appointed to undertake a site investigation report consisting of cable percussion boreholes, hand excavated trial holes, groundwater and surface water monitoring.
The investigation points were located on the quayside, which consisted of a potentially sensitive paved pedestrian area for the neighbouring shopping centre/district and management of public access throughout would be vital to undertake the works safely. In addition, working near water and the presence of existing structures and utilities required careful consideration.
In advance of the works, a walkover was undertaken with the Client, the shopping centre manager and the investigation team to discuss the works, agree the investigation locations and the mitigation measures required. A pedestrian and traffic management plan was outlined in our construction phase plan which also included a detailed programme to ensure all involved were aware of our planned movements.
Due to the proximity to the river and shallow groundwater in connection with it, consistent management of water levels when progressing the boreholes was key to ensure good recovery below the water table (by limiting blowing sands) and representative in-situ strength measurements when undertaking SPT testing.
Speak to Us Today
Get in touch with our team via our email, enquiries@earthsciencepartnership.com or phone number, 02920 813385 and we’ll be very happy to help with and discuss any geotechnical engineering project requirements you may have.
For a full list of all ESP capabilities, please click here.